Show simple item record

dc.contributor.authorDaniel, Emmanuel I.
dc.contributor.authorGarcia, Daniel
dc.contributor.authorMarasini, Ramesh
dc.contributor.authorKolo, Shaba
dc.contributor.authorOshodi, Olalekan
dc.contributor.editorPasquire, Christine
dc.contributor.editorHamzeh, Farook
dc.date.accessioned2019-10-21T14:47:41Z
dc.date.available2019-10-21T14:47:41Z
dc.date.issued2019-07-03
dc.identifier.citationDaniel, E.I, Garcia, D, Marasini, R., Kolo., S, Oshodi, O. (2019). “Improving Construction Management Practice in the Gibraltar Construction Industry .” In: Proc. 27th Annual Conference of the International. Group for Lean Construction (IGLC), Pasquire C. and Hamzeh F.R. (ed.), Dublin, Ireland, pp. 539-550. DOI: https://doi.org/10.24928/2019/0227.en
dc.identifier.issn2309-0979en
dc.identifier.doi10.24928/2019/0227en
dc.identifier.urihttp://hdl.handle.net/2436/622868
dc.description.abstractResearch has shown that 57% of activities in a construction project is non-value adding (waste) which contributes to the poor performance of the sector. While other countries of the world such the USA, UK, Brazil, Nigeria and Israel among others are seeking to understand this challenge and deploy innovative ways and modern techniques to improve it, limited studies have explored factors that contribute to non-value adding activities (NVA) in the Gibraltar construction industry. The current study aims to identify the factors that contribute to NVA on construction sites in Gibraltar and to present an outlook on how this could be minimised using Last Planner System(LPS). A combination of quantative and qualitative research approaches were used. Thirtyone questionnaire responses were analysed and seven semi-structured interviews were conducted. The investigation reveals that the development of unrealistic schedules, lack of adequate training, delayed approval process and work interruption due to the community are the key factors that contribute to NVA. The study found that the suggestions offered by construction professional for minimising NVA align with some LPS principles. The study concludes that some of the current practices, could serve as justification for the introduction of LPS in the construction sector of Gibraltar.en
dc.formatapplication/PDFen
dc.language.isoenen
dc.publisherAnnual Conference of the International. Group for Lean Construction (IGLC)en
dc.relation.urlhttp://iglc.net/Papers/Details/1666en
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 International*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectLast Planner Systemen
dc.subjectnon-value adding activitiesen
dc.subjectWasteen
dc.subjectworkflowen
dc.subjectGibraltaren
dc.titleImproving construction management practice in the Gibraltar construction industryen
dc.typeConference contributionen
dc.conference.name27th Annual Conference of the International Group for Lean Construction (IGLC)
dc.conference.locationDublin, Ireland
pubs.finish-date2019-07-05
pubs.start-date2019-07-03
dc.date.accepted2019-06-13
rioxxterms.funderSolent Universityen
rioxxterms.identifier.projectUOW21102019EDen
rioxxterms.versionAMen
rioxxterms.licenseref.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/en
rioxxterms.licenseref.startdate2019-10-21en
refterms.dateFCD2019-10-21T14:47:13Z
refterms.versionFCDAM
refterms.dateFOA2019-10-21T14:47:41Z


Files in this item

Thumbnail
Name:
Improving_Construction_Managem ...
Size:
550.4Kb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivatives 4.0 International
Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivatives 4.0 International