Show simple item record

dc.contributor.authorAlhumayn, Saud Abdullah
dc.date.accessioned2018-11-27T13:55:10Z
dc.date.available2018-11-27T13:55:10Z
dc.date.issued2018-10-01
dc.identifier.urihttp://hdl.handle.net/2436/621927
dc.descriptionA thesis submitted in partial fulfilment of the requirements of the University of Wolverhampton for the degree of Doctor of Philosophy (PhD).
dc.description.abstractThe construction industry in the Kingdom of Saudi Arabia (KSA) is faced with challenges of incessant delays, cost overruns and poor quality. The premise of the research reported here is that effective adoption and implementation of Building Information modelling (BIM) can contribute to the achievement of the necessary improvement. Against this backdrop, the aim of the research was to produce a strategic framework to underpin such adoption and implementation. It entailed investigation of the awareness of BIM, the extent of its use in KSA and the barriers to its more effective adoption and implementation. A mixed research approach was adopted, using a questionnaire survey and semi-structured interviews for collecting data. The questionnaire survey was used to obtain information on the awareness, barriers, drivers and status of BIM usage in the KSA construction industry, while the semi-structured interviews were designed to elicit the opinions of professionals and elucidate their own experiences in relation to the variables in this study. The data obtained were analysed using descriptive statistics, inferential statistics and thematic content analysis. The study found that the awareness of BIM in the Saudi construction industry is low and faced with inherent barriers that impede its successful application. These barriers were found to be a lack of knowledge of BIM, initial and running costs of implementation, a lack of training of personnel, and a fear of changing from the traditional methods of construction. The study identified strategies that could be used to address these challenges. These include enlightenment on the benefits of BIM application; creating awareness of BIM through workshops, seminars and conferences; training of workers; and the introduction of government intervention to enforce the application of BIM. In addition, this study identified the relevant factors that would enable the application of BIM in the Saudi construction industry to be meeting client's expectations and the requirement to use BIM technology, and using BIM because of the benefits it offers such as cost savings, efficiency, quality and increase in productivity. Regardless of these BIM drivers, however, the most important aim is to bring the stakeholders to commit themselves and invest in the necessary technology, tools and resources in order to improve construction processes. A strategic framework was developed to serve as a roadmap for BIM implementation. The framework also encompassed the key parties in the process and the specific roles to be played by them. The study concludes that the implementation of BIM could improve project performance in Saudi Arabia in terms of time, cost and quality.
dc.formatapplication/PDF
dc.language.isoen
dc.subjectCONSTRUCTION industry
dc.subjectBUILDING INFORMATION MODELLING
dc.subjectIMPLEMENTATION
dc.subjectADOPTION
dc.subjectAWARENESS
dc.subjectBARRIERS
dc.subjectBENEFITS
dc.subjectSTRATEGIES
dc.subjectTHE KINGDOM OF SAUDI ARABIA
dc.titleDeveloping a framework for BIM implementation in the Saudi Arabian construction industry
dc.typeThesis or dissertation


Files in this item

Thumbnail
Name:
Alhumayn_PhD Thesis.pdf
Size:
4.936Mb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record