• Admin Login
    Search 
    •   Home
    • Theses and Dissertations
    • Search
    •   Home
    • Theses and Dissertations
    • Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of WIRECommunitiesTitleAuthorsIssue DateSubmit DateSubjectsTypesJournalDepartmentPublisherThis CommunityTitleAuthorsIssue DateSubmit DateSubjectsTypesJournalDepartmentPublisher

    Administrators

    Admin Login

    Filter by Category

    SubjectsCase study (1)
    Construction (1)
    Developing countries (1)Dispute Avoidance (1)Dispute resolution (1)View MoreAuthorsMante, Joseph. (1)Ndekugri, Issaka. (1)Year (Issue Date)
    2014 (1)
    Types
    Doctoral (1)
    PhD (1)Thesis or dissertation (1)

    Local Links

    AboutThe University LibraryPublications PolicyDeposit LicenceCORESubmit item

    Statistics

    Display statistics
     

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Now showing items 1-1 of 1

    • List view
    • Grid view
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    • 1CSV
    • 1RefMan
    • 1EndNote
    • 1BibTex
    • Selective Export
    • Select All
    • Help
    Thumbnail

    Resolution of Construction Disputes Arising from Major Infrastructure Projects in Developing Countries – Case Study of Ghana

    Mante, Joseph. (University of Wolverhampton, 2014)
    This study undertook a critical examination of developing countries’ experiences of infrastructure-related construction dispute resolution using Ghana as a case study. It investigated the dispute resolution processes and procedures which parties to infrastructure construction disputes employed to address such disputes. To gain a better understanding of the dispute resolution processes, the study also assessed the legal framework for procurement and contract formation and other contextual issues which influenced parties’ dispute resolution choices. Consequently, strategies for efficient and effective dispute resolution were developed. The main rationale for the study was the need for effective and efficient dispute resolution processes in the context of infrastructure projects in developing countries. The literature indicated that disputes often occurred on such projects in developing countries that were resolved at great cost mainly by arbitral tribunals in the developed world. However, there was limited information on the extent to which other dispute resolution mechanisms were utilised prior to resort to international arbitration. The study adopted a qualitative research approach informed by the interpretivist philosophical paradigm. Data was collected from fifty-six interviewees from the State as the Employer and foreign contractors through semi-structured interviews and documents and analysed using qualitative data analysis procedures associated with grounded theory research such as coding, constant comparison, memoing and diagramming, and doctrinal legal analysis. It was found that engineer’s determination, negotiation and international arbitration were the most used dispute resolution mechanisms. Others such as mediation were rarely used. The dispute resolution processes were characterised by high cost, low satisfaction with outcomes and negative effect on relationships. It was also found that the extant dispute resolution processes were the product of the nature of the parties, the context in which they operated and their responses to the context. Factors such as lack of coordination among the Employer’s sub-units, human resource constraints and political interference had varying negative impacts on dispute occurrence, dispute resolution system design and the dispute resolution processes. To deal with these challenges and achieve efficient and effective dispute resolution processes, four sets of remedial strategies (condensed into a model called the Dispute Resolution Efficiency Cycle (DREC)) were proposed. The study has provided empirical evidence which has addressed some of the gaps identified in the literature on issues such as absence of information on pre-international arbitration dispute processes. The study has also highlighted the impact of context and dispute system design on dispute resolution. Contributions to practice included diagnosing challenges with the extant dispute resolution processes and proposing possible remedial strategies.
    DSpace software (copyright © 2002 - 2019)  DuraSpace
    Quick Guide | Contact Us
    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.