• Admin Login
    Search 
    •   Home
    • Theses and Dissertations
    • Search
    •   Home
    • Theses and Dissertations
    • Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of WIRECommunitiesTitleAuthorsIssue DateSubmit DateSubjectsTypesJournalDepartmentPublisherThis CommunityTitleAuthorsIssue DateSubmit DateSubjectsTypesJournalDepartmentPublisher

    Administrators

    Admin Login

    Filter by Category

    Subjects
    Abu Dhabi (1)
    construction projects (1)
    fast track projects (1)
    Framework (1)
    Risk management (1)
    View MoreAuthorsHarthi, Bader Ahmed Al (1)Year (Issue Date)2015 (1)Types
    Thesis or dissertation (1)

    Local Links

    AboutThe University LibraryPublications PolicyDeposit LicenceCORESubmit item

    Statistics

    Display statistics
     

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Now showing items 1-1 of 1

    • List view
    • Grid view
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    • 1CSV
    • 1RefMan
    • 1EndNote
    • 1BibTex
    • Selective Export
    • Select All
    • Help
    Thumbnail

    Risk management in fast-track projects

    Harthi, Bader Ahmed Al (2015)
    This thesis is about risk management in fast-track construction projects. The aim of the study is to identify the risks in the UAE construction industry, understand how they are dealt with, and propose more effective frameworks for risk management in fast-track construction. A mixed method approach was used to fulfil the objectives of the study. 65 questionnaires were distributed to professionals in the construction industry, including contractors, sub-contractors, project managers and private consultants. Their responses were analysed using statistical techniques, and the results taken for discussion to a focus group of eleven experienced construction managers and experts. Secondary data was also collected via literature reviews of print and website articles, and of books and documents from company, government and industry-specific databases. The findings show that risks in construction projects can be internal or external, and that in the UAE, owner- and design-related risks are seen as the most significant. Knowledge about risk management is present, but more needs to be done to eradicate the problems associated with poorly managed fast-track construction projects. Using the suggestion of the focus group, a framework for risk mitigation was developed based on the Alien Eyes’ risk and Qualitative Risk Management models. The study discusses the implications of risk management for practitioners and academicians in the construction industry. Poor risk management, which is usually the consequence of inadequate recognition of and/or responsiveness to risks and uncertainties, can have a devastating impact upon projects. It is hoped that practitioners applying the findings and suggestions in this study will see positive change, improved profitability and greater competitive advantage as a result.
    DSpace software (copyright © 2002 - 2019)  DuraSpace
    Quick Guide | Contact Us
    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.