• Admin Login
    View Item 
    •   Home
    • Theses and Dissertations
    • Theses and Dissertations
    • View Item
    •   Home
    • Theses and Dissertations
    • Theses and Dissertations
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of WIRECommunitiesTitleAuthorsIssue DateSubmit DateSubjectsTypesJournalDepartmentPublisherThis CollectionTitleAuthorsIssue DateSubmit DateSubjectsTypesJournalDepartmentPublisher

    Administrators

    Admin Login

    Local Links

    AboutThe University LibraryOpen Access Publications PolicyDeposit LicenceCOREWIRE Copyright and Reuse Information

    Statistics

    Display statistics

    AN INVESTIGATION INTO THE IMPLEMENTATION OF THE CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS IN THE CONSTRUCTION INDUSTRY

    • CSV
    • RefMan
    • EndNote
    • BibTex
    • RefWorks
    Thumbnail
    Name:
    Mzyece_PhD thesis.pdf
    Size:
    6.625Mb
    Format:
    PDF
    Description:
    Thesis
    Download
    Authors
    Mzyece, Dingayo
    Issue Date
    2015-01
    
    Metadata
    Show full item record
    Abstract
    The European Union (EU), in 1992, issued the Temporary or Mobile Construction Sites (TMCS) Directive, which requires EU members to introduce specific law to improve health and safety (H&S) performance outcomes by placing specific duties on key stakeholders. This Directive led to the introduction of the first Construction (Design and Management) (CDM) Regulations in the UK construction industry on 31 March 1995 and since their introduction, the overall performance of construction H&S has improved gradually. However, despite this positive outlook, there are still significant concerns surrounding the implementation of the CDM Regulations, a subject on which empirical research has been very scanty. It is against such a background that this study investigates the practical implementation of the CDM Regulations and extends current knowledge and understanding, and develops a framework for appropriate remedial action by industry. The research method involved a thorough critical review of literature, semi-structured interviews, and two postal questionnaire surveys, using as research informants, practitioners with experience of the Designer, CDM Coordinator (CDM-C), and Principal Contractor (PC) roles under the CDM Regulations. Primary data were collected and analysed from in-depth interviews with six organisations purposively selected based on their construction design expertise and 122 questionnaires returned in total. The finding regarding lack of collaborative working amongst duty holders is a significant outcome of this study; a requirement expressed explicitly within the CDM Regulations, yet questionable in terms of its implementation. Further, the study reveals a number of statistically significant correlations between the extent of discharge of duties and their perceived degree of importance. However, the strength of the majority of these correlations is weak. In particular, the evidence indicates that 50% of the duties of the CDM-C are misaligned in terms of extent of discharge and perceived degree of importance, whereas 25% of the PC duties are also misaligned. This signals a lack of understanding regarding the importance of duties, towards achieving improved H&S management. Surprisingly, a comparison between extent of discharge of duties and their perceived degree of difficulty reveals that all the duties of the PC are statistically significant, meaning that the perceived degree of difficulty does not impede their extent of discharge. While 90% of the CDM-C duties are also statistically significant, again the same interpretation applies. Further, a consensus reached by Designers supports the view that CDM-Cs provide insufficient input throughout the planning and construction phase, raising doubt as to whether the duty holder is fit for purpose. Overall, the results confirm that interdependent working of duty holders is still a challenge, demonstrated by the Designer duty to ensure appointment of the CDM-C (Regulation 18(1)), the CDM-C duty to ensure Designers comply with their duties (Regulation 20(2)(c)), and the PC duty to liaise with the CDM-C and Designer (Regulation 22(1)(b)). Three recurring themes emerge from the results, that is: (i) collaboration, (ii) accountability and compliance, and (iii) facilitation, which in turn inform the remedial action framework comprising 13 remedial actions and 8 change drivers. Validation of the remedial action framework by 15 study participants reveals that, at least 10 remedial actions and 7 change drivers are considered likely to improve CDM implementation. The top three remedial actions are: (i) ensuring adequate arrangements for coordination of H&S measures; (ii) including provisions within the regulations specifying the stages for the appointment of duty holders; and (iii) amending the ACoP to provide guidance on determining what resources are adequate for a particular project. Whereas, the top three change drivers are: (i) management leadership; (ii) the proactive participation of duty holders; and (iii) training to equip duty holders with sufficient knowledge on provision of timely and adequate preconstruction information. Based on these outcomes, conclusions, recommendations, and further areas of research are drawn.
    URI
    http://hdl.handle.net/2436/558782
    Type
    Thesis or dissertation
    Language
    en
    Description
    thesis submitted in partial fulfilment of the requirements of the University of Wolverhampton for the degree of Doctor of Philosophy (PhD)
    Collections
    Theses and Dissertations

    entitlement

     
    DSpace software (copyright © 2002 - 2023)  DuraSpace
    Quick Guide | Contact Us
    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.