• Admin Login
    View Item 
    •   Home
    • Faculty of Science and Engineering
    • Faculty of Science and Engineering
    • View Item
    •   Home
    • Faculty of Science and Engineering
    • Faculty of Science and Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of WIRECommunitiesTitleAuthorsIssue DateSubmit DateSubjectsTypesJournalDepartmentPublisherThis CollectionTitleAuthorsIssue DateSubmit DateSubjectsTypesJournalDepartmentPublisher

    Administrators

    Admin Login

    Local Links

    AboutThe University LibraryOpen Access Publications PolicyDeposit LicenceCOREWIRE Copyright and Reuse Information

    Statistics

    Display statistics

    Critical Success Factors of the BOOT Procurement System: Reflections from the Stadium Australia Case Study

    • CSV
    • RefMan
    • EndNote
    • BibTex
    • RefWorks
    Authors
    Jefferies, Marcus
    Gameson, Rod
    Rowlinson, Steve
    Issue Date
    2002
    
    Metadata
    Show full item record
    Abstract
    Recent trends in the provision of infrastructure development indicate that the private sector is playing an increasingly important role in the procurement process. This trend has partly arisen out of a necessity for the development of infrastructure to be undertaken at a rate that maintains and allows growth. This has become a major challenge for many countries where it is evident that these provisions cannot be met by government alone. The emergence of Build-Own-Operate-Transfer (BOOT) schemes as a response to this challenge provides a means for developing the infrastructure of a country without directly impacting upon the government's budgetary constraints. The concepts of BOOT are without doubt extremely complex arrangements, which bring to the construction sector risks not experienced previously. This paper examines perceptions of BOOT schemes in order to develop a framework of critical success factors. The developed framework is then tested against a case study of Stadium Australia, and the outcomes of the comparison are discussed. (Emerald Group Publishing Limited)
    Citation
    Engineering, Construction and Architectural Management, 9(4): 352-361
    Publisher
    Emerald Group Publishing Ltd.
    Journal
    Engineering, Construction and Architectural Management
    URI
    http://hdl.handle.net/2436/28895
    DOI
    10.1108/eb021230
    Additional Links
    https://www.emeraldinsight.com/doi/abs/10.1108/eb021230
    Type
    Journal article
    Language
    en
    ISSN
    0969-9988
    ae974a485f413a2113503eed53cd6c53
    10.1108/eb021230
    Scopus Count
    Collections
    Faculty of Science and Engineering

    entitlement

     
    DSpace software (copyright © 2002 - 2023)  DuraSpace
    Quick Guide | Contact Us
    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.