• Admin Login
    View Item 
    •   Home
    • Faculty of Science and Engineering
    • Faculty of Science and Engineering
    • View Item
    •   Home
    • Faculty of Science and Engineering
    • Faculty of Science and Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of WIRECommunitiesTitleAuthorsIssue DateSubmit DateSubjectsTypesJournalDepartmentPublisherThis CollectionTitleAuthorsIssue DateSubmit DateSubjectsTypesJournalDepartmentPublisher

    Administrators

    Admin Login

    Local Links

    AboutThe University LibraryOpen Access Publications PolicyDeposit LicenceCOREWIRE Copyright and Reuse Information

    Statistics

    Display statistics

    Achieving Best Value in Private Finance Initiative Project Procurement

    • CSV
    • RefMan
    • EndNote
    • BibTex
    • RefWorks
    Authors
    Akintoye, Akintola
    Hardcastle, Cliff
    Beck, Matthias
    Chinyio, Ezekiel A.
    Asenova, Darinka
    Issue Date
    2003
    
    Metadata
    Show full item record
    Abstract
    The wherewithal of achieving best value in private finance initiative (PFI) projects and the associated problems therein are documented. In the UK, PFI has offered a solution to the problem of securing necessary investment at a time of severe public expenditure restraint. In PFI schemes, the public sector clients must secure value for money, while the private sector service providers must genuinely assume responsibility for project risks. A broad-based investigation into PFI risk management informs the discussion in this paper. It is based on 68 interviews with PFI participants and a case study of eight PFI projects. The research participants comprised of contractors, financial institutions, public sector clients, consultants and facilities management organizations. The qualitative software Atlas.ti was used to analyse the textual data generated. The analysis showed that the achievement of best value requirements through PFI should hinge on: detailed risk analysis and appropriate risk allocation, drive for faster project completion, curtailment in project cost escalation, encouragement of innovation in project development, and maintenance cost being adequately accounted for. Factors that continue to challenge the achievement of best value are: high cost of the PFI procurement process, lengthy and complex negotiations, difficulty in specifying the quality of service, pricing of facility management services, potential conflicts of interests among those involved in the procurement, and the public sector clients' inability to manage consultants. (Routledge)
    Citation
    Construction Management and Economics, 21(5): 461-470
    Publisher
    Routledge (Taylor & Francis)
    Journal
    Construction Management and Economics
    URI
    http://hdl.handle.net/2436/28874
    DOI
    10.1080/0144619032000087285
    Additional Links
    https://www.tandfonline.com/doi/abs/10.1080/0144619032000087285
    Type
    Journal article
    Language
    en
    ISSN
    01446193
    1466433X
    ae974a485f413a2113503eed53cd6c53
    10.1080/0144619032000087285
    Scopus Count
    Collections
    Faculty of Science and Engineering

    entitlement

     
    DSpace software (copyright © 2002 - 2023)  DuraSpace
    Quick Guide | Contact Us
    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.